Isfahan Refinery Optimization Project

Title:

 

Isfahan Refinery Upgrading Project

 

Goals: 
  • Stabilize Capacity On 360,000 BPSD
  • Upgrade existing refinery  in order to increase production of light products
  • Maximize Gasoline Production
  • Minimize Fuel Oil Production
  • Meet the Environmental Protection Obligations

 

 investment:

2.7  B €

 

Consultans :

 

 

  • Basic Design : Snam Projetty (Italy)
  • PMC: Joint Venture of  Namvaran Delvar & Moein Energy ( Iran)

 

Contractors:

 

 

 

 

  •  Package A1 : RHU - DAELIM & Namvaran
  •  Package A2 : RFCC + Propylene Recovery  -  SEI
  • Package B : New (CDU-LPG-Kerosene Treating Units- WWT, …) Revamop ( CDU/VDU 1&2- LPG 1&2- Fire Water System-WWT)
  • Package C : Untities - Mapna
  • Packeage D : DHT 1&2-LPG Merox-ATU-SWS-SRU-TGTU-RFCC- Chegalesh& Nargan
  • Packeage E : H2 1&2 – PSA Chegalesh & Nargan  

Licensors:

  Axens , Linde, Topsoe , UOP , Technip , KTI

 Latest Status :

 Epc Activities in Progress

  
No. New Units Cap. BPSD
1
CDU
120000   
2 Naphta HDT 62000   
3 Gas Oil  HDT 48000*2
4 RFCC Gasoline Treatment  50000
5 RHU  81000
6 RFCC  84000
7

Hydrogen Plant

  101000*2
8 Sulfur Recovery Unit   300*2 TPD
9   HN CCR   32000
10   LN Isommerization  27000
11 LPG Merox  24000

     

No. PRODUCT Existing Cap. BPSD New Cap BSPD
1   Gasoline   41000

130000

2   Kerosene  61000

44600  

3   Gas Oil

109000

 115000  
4   LPG

17000

30000  

5   Propylene  0

7400  

6   Fuel Oil  89000

19000  

7   Sulfur   80 TPD 600 TPD